On July 24, the Executive Engineer (Works) of KPCL at Kargal in Sagar taluk informed that the level could reach the maximum capacity soon due to high inflow of water
On July 24, the Executive Engineer (Works) of KPCL at Kargal in Sagar taluk informed that the level could reach the maximum capacity soon due to high inflow of water