The Yellow Line — a critical 19-km corridor connecting R.V. Road to Bommasandra via key bottlenecks like Silk Board — was originally scheduled to open in 2021 Related posts: Operation Shubayathra review meeting held Stalin trying to turn NEP into a political campaign: MoS Education Telangana ramps up security at key locations post Pahalgam terror strike Helicopter on way to Kedarnath crashlands on highway, all safe