The students have to use a temporary bamboo bridge to cross the Nallathanni river during the rainy season. The original bridge over the river was swept away in the 2018 floods and has not been reconstructed till now Related posts: Vinesh Phogat disqualified: PM Modi asks IOA President P.T. Usha to explore full range of options to help Vinesh’s case Attackers of Constitution posing as champions of Constitution: BJP’s Tejasvi Surya in Lok Sabha Renovated Kozhikode Town Hall inaugurated India’s media ecosystem doesn’t need validation from foreign bodies: Centre