Addressing the media here, Ms. Sharmila said the full storage capacity of the project was reduced from 45 metres to 41 metres, reducing what had been designed to be the lifeline of Andhra Pradesh into a barrage

Leave a Reply

Your email address will not be published. Required fields are marked *